Engir hlutir fundust.
MIÐGARÐUR
MIÐGARÐUR
MIÐGARÐUR

MIÐGARÐUR

YEAR:
Location:
Group:
POSITION:
SIZE:
2022
Gardabaer
Public buildings
Completed
18.500 m2

Multipurpose gymnasium. A hall with a full-size football field, a climbing wall at the end of the hall and a facility for 800 spectators on a balcony that surrounds the hall on the 2nd floor. The side buildings include lobbies and porticoes, an elevator room, dressing rooms, staff facilities and more.